Goel Groups one of the biggest ongoing project on date is the tilda division of Shri Bajrang Power and Ispat Ltd. The 1st phase consists of a 2 MTPA Iron ore Beneficiation plant, 1.4 million MTPA Iron ore Pelletization plant, one 500 TPD DRI kiln, 16 MW Captive Power plant and its in-house rail line. All the above-mentioned systems have successfully been commissioned.

The company aims to achieve 2 MTPA liquid metal from this project in near future. Also it has the same vision and mission as its other sister concern units to be one of the most efficiently operated plants.

The Tilda division is well facilitated with operational and expansion needs such as land, water and incoming source of raw material (through rake). In terms of infrastructure, the tilda division also has its own residential colony expanding with an area of over 30 acres, which is adjoining the plant area. 

The plant facilities for the first phase at Tilda Division:
• 2 MTPA Iron Ore Beneficiation Plant.
• 1.4 MTPA Pellet Plant with Straight grate Technology.
• 3 Set of 3.6 MTR Two Stage Cold Coal Gasifier System with output 16,971 Nm3/Hour.
• Coal Based Sponge Iron Kiln, 1x Capacity- 500 Tonne per day.
• 16MW Captive Power Plant with 63 TPH WHRB Boiler.
• RAILWAY SIDING